Skip to content
Finished uniform programmes on the rail before dispatch
Delivered programmes

Uniform programmes, with the numbers attached.

Every case below carries the quantity, the run time and what changed afterwards. Photos alone do not tell a procurement team anything, so we publish the figures that actually get compared when suppliers are shortlisted.

1M+Garments shipped
50+Cities served
12Sectors supplied
98%On time dispatch
Case studies

Programmes we rebuilt from the pattern up.

Filter by sector. Client names are published with permission, and figures are taken from the closing production report, not rounded up for the website.

Corporate Corporate uniform programme across six departments
6 departments / 3 sites

Meridian Group

Four suppliers had left them with three different navies across head office, branch and field teams. We re-patterned one wardrobe, lab dipped a single shade and held a size buffer for new starters.

4,800Pieces
26 daysBulk run
1Shade standard
Education School uniform programme across eleven campuses
3 year contract / 11 campuses

St. Andrews College

Blazers and PE kit re-patterned for a hotter climate in a lighter blend that still held its shape. Cartons arrived labelled by campus, so nobody had to sort a delivery.

7,200Pieces
0.4%Return rate
11Campuses
Hospitality Hotel uniform wardrobe across nine properties
9 properties / 4 departments

Harbourview Hotels

Front desk, concierge, housekeeping and food service built as one wardrobe, engineered to survive industrial laundry without losing the tailored line.

9,800Pieces
4Suppliers replaced
26 daysTo first delivery
Healthcare Medical scrub programme for a clinic group
14 clinics / colour coded roles

Civic Health

Scrubs colour coded by role so patients can tell a nurse from a technician at a glance. Antimicrobial finish tested through 60 degree laundry before bulk was cut.

5,600Pieces
6Role colours
72hTop up dispatch
Industrial Industrial workwear programme across fourteen depots
14 depots / site audit passed

Northline Logistics

We watched a driver work a full shift before touching the pattern. Coveralls were re-cut for movement and reflective tape repositioned to clear the site audit.

12,400Pieces
38%Fewer replacements
14Depots
Sport Sublimated team kit programme for a football league
18 clubs / full sublimation

Eastside Football League

Eighteen clubs, eighteen colourways, one season deadline. Custom uniforms sublimation let every club keep its own identity without an eighteen fold rise in setup cost.

2,900Kits
18Colourways
19 daysFull delivery
Harbourview Hotels uniform wardrobe across nine properties
9,800Garments in one programme
Programme in focus

Four suppliers, four navies, one fix.

Harbourview ran nine properties through four suppliers. Every department looked close but nothing actually matched, and reorders drifted further each year. We rebuilt the wardrobe from one block set and one lab dipped shade, then held the fabric so year two would not drift again.

4 to 1Suppliers consolidated
26 daysTo first delivery
9Properties supplied
3 yearsShade held on file

The reorder matched the original run exactly. That sounds small until you have had a supplier send a different navy and call it the same navy.

Marcus TanGeneral Manager, Harbourview Hotels
From the floor

Garments out of recent programmes.

Click any image to open it full size.

Corporate shirting folded for dispatch
Corporate shirting, 3,400 pieces
Antimicrobial scrub set
Scrub sets, antimicrobial finish
Uniforms hung in size order
Sorted by size and site
Embroidered chest emblem in progress
Chest branding
Sublimated football kits for a league programme
League kits, 18 colourways
Hospitality waistcoat construction detail
Front desk wardrobe
Hi-vis workwear with reflective tape applied
Hi-vis, tape repositioned
Shirt cuff and placket construction
Cuff construction
Who we supply

Contracts that reordered.

The only client list worth publishing is the one that came back. Each of these has run at least a second programme with us.

Meridian GroupCorporate / 4 years
St. Andrews CollegeEducation / 3 years
Harbourview HotelsHospitality / 5 years
Northline LogisticsIndustrial / 3 years
Civic HealthHealthcare / 6 years
Apex AirlinesAviation / 2 years
Steelworks LtdIndustrial / 4 years
Eastside Football LeagueSport / 2 seasons

Sectors we supply

Corporate Education Healthcare Hotels and resorts Restaurants Manufacturing Construction Aviation Retail Government Security Sport and clubs